Guandi Hydroelectric Project is situated 30 km from Xichang City in straight line and 80 km by road. It is the third of the five cascade projects on the river section from Kala to the estuary, and connects with the downstream Ertan Project. The main purpose of Guandi Project is power generation, and its total installed capacity is 2400MW. With the maximum height of the dam being 168m, at the normal pool level of El. 1330m the reservoir has a total storage of 760 million cubic meters. The complex mainly consists of a RCC (roller-compacted concrete) gravity dam, an underground powerhouse on the right bank, and spillway facilities. Its total static investment is RMB12.49 billion yuan, while the total dynamic investment is RMB15.2 billion yuan.